Industrial Solid Color
High-build roller-applied epoxy with a polyurethane topcoat. The workhorse for warehouses, plants and distribution bays.
- 12–20 mil build
- Forklift & pallet-jack rated
- Optional safety-line striping
Seamless, chemical-resistant resin floors engineered for facilities that can't afford downtime — warehouses, showrooms, commercial kitchens, gyms and retail. Design the finish yourself and get a ballpark number before a rep ever calls.
Systems
We spec the resin system to the abuse it will take — traffic, chemistry, temperature and cleanability — then finish it to match your space.
High-build roller-applied epoxy with a polyurethane topcoat. The workhorse for warehouses, plants and distribution bays.
Three-dimensional pigment pours that read like liquid stone. Built for auto showrooms, lobbies and retail floors.
Broadcast media locked in resin for slip resistance and hard wear — kitchens, breweries, locker rooms and wash bays.
Heavy-duty resurfacer for food and beverage production where steam, acids and hot water are daily reality.
Sectors








Process
Upload a photo of the space, pick your system and finish, and get an instant square-foot estimate.
We test moisture, check slab condition and confirm the schedule that keeps your operation running.
Diamond grinding or shot blasting to a proper profile, then crack, joint and spall repair.
Resin goes down in controlled lifts, followed by the topcoat that sets gloss and slip resistance.
Most commercial installations land between $4 and $12 per square foot depending on system, surface prep and floor condition. Solid-color industrial coatings sit at the low end; metallic showroom pours and urethane cement sit at the high end. Run your space through our design tool for a ballpark figure in minutes.
A typical 3,000 sq ft space is diamond-ground, coated and topcoated in 2–4 days. Light foot traffic usually returns 24 hours after the final coat and full chemical cure lands around day seven. We schedule nights and weekends when production can't stop.
Properly prepped and topcoated systems run 10–20 years in commercial service. Longevity comes from mechanical surface prep and the right topcoat — not from the epoxy thickness alone.
Yes. We diamond-grind or shot-blast to bare, profiled concrete, then patch spalls, joints and cracks before any resin goes down. Failing prior coatings are removed rather than coated over.
Every system can be finished with a broadcast aggregate or textured additive to hit the slip resistance your insurer or health inspector requires, without giving up cleanability.
Two minutes in the design tool gets you a rendered floor and a square-foot estimate. If the number works, we'll schedule the walkthrough.
Start Your Design